Knock the rungs into an upright
1 sec/storage unit w foldable table, 89 × 30 × 179 cm
40 min · two people · 34 steps · 29 panels · 161 fittings
Knock the rungs into an upright
Knock the pegs in
Knock the second upright onto the rungs
Peg the second upright
Build the other side unit the same way
Stand the sides up and put the shelves in
Screw on the cross brace
Tap the dowels into the top and the bottom
Fit a side onto the dowels
Slide the back panel into its grooves
Fit the other side
Screw the hinge plates to the sides
Screw the cabinet brackets to the uprights
Lift the cabinet in onto the brackets
Fix the top of the cabinet to the back uprights
Screw the hinges onto the doors
Click the doors onto the hinge plates
Put the shelves in on their pins
Line the doors up
Lay out the two frame rails
Tap in the dowels and push the posts on
Bolt the frame together
Screw the levelling foot into the leg
Screw the stop pin into the top rail
Screw the hinge brackets onto the back post
Screw the hinges to the back strip
Screw the stop block under the top
Screw the hinges to the top
Clear the shelf at table height
Hang the leg frame on the front upright
Hook the support brackets into the uprights
Lay the table on together
Screw the strip to the brackets
Strap it to the wall